What Happens on Key Collection Day (And What to Do Before the Contractor Arrives)

IDLah Content Team
12 min read
May 4, 2026
Article Details
IDLah Content Team
12 min read
May 4, 2026

Key collection day is one of the most exciting moments — but it’s also one of the most important to get right.

Most people handle the “exciting” part well.
The “important” part? That’s where things usually go wrong.

The Common Mistake

Typical scenario:

  • 10 AM → Collect keys
  • 1 PM → Contractor arrives

In between:

  • Take photos
  • Celebrate
  • Walk around imagining furniture

Three weeks later:

  • Renovation hasn’t started
  • Contractor is waiting
  • Defects not reported
  • Measurements inaccurate

What You Should Do Instead

Hour 1 — Document Every Defect

HDB will fix defects — but only if you report them within the timeline.

Go room by room:

  • Start from the main door
  • Move clockwise

Check:

  • Cracks
  • Scratches
  • Doors not closing properly
  • Window sealing issues
  • Hollow tiles

Test everything:

  • Taps
  • Toilets (flush twice)
  • Power points

💡 Tip:
Most units have 20–40 defects
If you find <10 → you’re likely missing things

Hour 2 — Measure Everything

Floor plans are not perfectly accurate.

Common differences:

  • Wall lengths: off by 5–30 cm
  • Ceiling height varies
  • Toilet rough-in not shown

👉 Use a laser measure (cheap & accurate)

Process:

  • Measure each wall
  • Write directly on wall (pencil)
  • Take photos

This step is often skipped — but critical.

Hour 3 — Create Documentation Archive

Do a full video walkthrough:

  • Narrate condition of each room

Then:

  • Upload all photos/videos to Google Drive
  • Name it: "BTO Original Condition [Date]"

Send to contractor before they arrive.

Why Timing Matters

Defect reporting deadlines are strict:

  • Ceiling leaks → within 1 week
  • Wall cracks → within 1 month

Miss it → you pay yourself

Documentation timing can decide disputes.

Before Contractor Arrives

Don’t call them immediately after key collection.

Instead:

  • Take ~3 hours first
  • Send:
    • Measurements
    • Defect photos

Result:

  • More accurate quote
  • Faster renovation start

The Bottom Line

Key collection day is a working day first, celebration second.

If you:

  • Document properly
  • Measure accurately

👉 Your renovation will be:

  • Faster
  • Smoother
  • Cheaper

Skip this → you’ll fix problems that weren’t yours.